The clients requested green pallasade fencing that we got specially made. Some of the fencing is bolted to the concrete retaining while the rest is dug into the ground. A total of 3 pedestrian gates and 1 pair of double gates were also installed. Over 120m of fencing installed in just 4 days. The clients were over the moon and we was very well looked after.